setting up filming schedule

 Filming schedule


this weekend my group and I decided it would be the perfect time in our project timeline to set up a regulated filming schedule that worked for all of us, after all with all of us being full-time students and some of us have very demanding extracurriculars this is not the easiest of tasks to set up and coordinate. We all decided that next week would work for all of us to start filming some shots for our film and get the ball rolling on the production side of the project.

With our filming schedule taking shape we decided what days of next week we would be available to shoot some footage. during our talk about our availability, we discussed how we would plan the shooting days one of the days next week would a focus only on location scouting and focusing on stuff that wouldn't be shot directly like props and stuff, and then the rest of the days would consist of around one hour to an hour thirty of getting suitable footage for our film opening. 

We as a group still need to discuss further extras for our film opening and other aspects of it such as certain plot elements and the ways that we would like them to go down as well as finalizing a list of props and take care of the musical aspect of the party scenes as well as making sure the lighting is sorted by the shooting dates. So with a lot on our plates it is time to lock in and get to work.

No comments:

Post a Comment

Film Opening

Film Opening Project Upload Link https://youtu.be/KlYUqRzOCgI